skip to main content
Show Results with:

Results 1 - 10 of 91  for Everything in this catalogue

results 1 2 3 4 5 next page
Refined by: publisher: Heidelberg; Springer remove
Result Number Material Type Add to My Shelf Action Record Details and Options
1
Material Type:
Article
Add to My workspace

Study on the Design of Chinese Vehicle for Both Railways and Highways

Gao, Y. et al.

Lecture notes in electrical engineering.; High-speed and intercity railways; Shenzhen, China, 2011; Jul, 2012, 195-200 -- Heidelberg; Springer; c2012 Part: Part; (pages 195-200) -- 2012

Check library holdings

2
Material Type:
Article
Add to My workspace

Application of Train-Bridge-Interaction Analysis to Bridge Design of High-Speed Railways in China

Xia, H. et al.

Lecture notes in electrical engineering.; High-speed and intercity railways; Shenzhen, China, 2011; Jul, 2012, 355-372 -- Heidelberg; Springer; c2012 Part: Part; (pages 355-372) -- 2012

Check library holdings

3
Material Type:
Article
Add to My workspace

On-Track Load Spectrum Test Study of Motor Bogie Frame of High-Speed Train

Wang, W.J. et al.

Lecture notes in electrical engineering.; High-speed and intercity railways; Shenzhen, China, 2011; Jul, 2012, 339-348 -- Heidelberg; Springer; c2012 Part: Part; (pages 339-348) -- 2012

Check library holdings

4
Material Type:
Article
Add to My workspace

The Influence of Different Cross-Section Shapes of Train Body on Aerodynamic Performance

Liu, C.H. et al.

Lecture notes in electrical engineering.; High-speed and intercity railways; Shenzhen, China, 2011; Jul, 2012, 19-30 -- Heidelberg; Springer; c2012 Part: Part; (pages 19-30) -- 2012

Check library holdings

5
Material Type:
Article
Add to My workspace

The Evolution and Outlook of Core Technologies for High-Speed Railway in China

Lee, K.K.; Ni, Y.-Q.; Ye, X.-W.

Lecture notes in electrical engineering.; High-speed and intercity railways; Shenzhen, China, 2011; Jul, 2012, 495-508 -- Heidelberg; Springer; c2012 Part: Part; (pages 495-508) -- 2012

Check library holdings

6
Material Type:
Article
Add to My workspace

Conceptual Design of Prestressed Structures

Su, W.Z.; Ni, Y.-Q.; Ye, X.-W.

Lecture notes in electrical engineering.; High-speed and intercity railways; Shenzhen, China, 2011; Jul, 2012, 125-130 -- Heidelberg; Springer; c2012 Part: Part; (pages 125-130) -- 2012

Check library holdings

7
Material Type:
Article
Add to My workspace

Risk-Based Railway Systems Design Adopted for the XRL

Leung, C.L. et al.

Lecture notes in electrical engineering.; High-speed and intercity railways; Shenzhen, China, 2011; Jul, 2012, 467-472 -- Heidelberg; Springer; c2012 Part: Part; (pages 467-472) -- 2012

Check library holdings

8
Material Type:
Article
Add to My workspace

Effects of Shifting Running Time Supplements

Siefer, T. et al.

Lecture notes in electrical engineering.; High-speed and intercity railways; Shenzhen, China, 2011; Jul, 2012, 433-440 -- Heidelberg; Springer; c2012 Part: Part; (pages 433-440) -- 2012

Check library holdings

9
Material Type:
Article
Add to My workspace

Research of the Influence on the High-Speed Railway Bridge's Pile Foundation by Regional Land Settlement

Li, L. et al.

Lecture notes in electrical engineering.; High-speed and intercity railways; Shenzhen, China, 2011; Jul, 2012, 395-402 -- Heidelberg; Springer; c2012 Part: Part; (pages 395-402) -- 2012

Check library holdings

10
Material Type:
Article
Add to My workspace

Discussion on Monitoring Technology Proposal for High and Steep Side-Slope on Railway in Mountain Area

Xu, J. et al.

Lecture notes in electrical engineering.; High-speed and intercity railways; Shenzhen, China, 2011; Jul, 2012, 289-308 -- Heidelberg; Springer; c2012 Part: Part; (pages 289-308) -- 2012

Check library holdings

Results 1 - 10 of 91  for Everything in this catalogue

results 1 2 3 4 5 next page

Refine Search Results

Try a new search

Ignore my search and look for everything

by this Author/Contributor:

  1. Ni, Y.-Q.
  2. Ye, X. w.
  3. Wang, P.
  4. Yang, G.
  5. Yang, Z.

Searching Remote Databases, Please Wait